امتیاز کاربران

ستاره فعالستاره فعالستاره فعالستاره فعالستاره فعال
 
مهندس کوروش کیهان
 

 دانش آموخته کارشناسی ارشد دانشگاه صنعتی شریف

دانش آموخته کارشناسی مهندسی آب از دانشگاه خواجه نصیر

 

فایل سابقه کار مهندس کیهان

فایل فهرست دوره های برگزار شده توسط مهندس کیهان

 

 

فایل سرفصل دوره Mike21

 

 

CURRICULUM VITAE

Name

Kourosh Kayhan

Date of birth

07 November 1973

Nationality

Iranian

Education

M.Sc. in Civil Engineering, Sharif University of Technology of Iran 1998

B.Sc. in Civil Engineering, Khajeh Nasir Al-Din Toossi (K.N.T) University of Technology of Iran 1996

Memberships

Iranian Society of Consulting Engineers (ISCE)

Iranian Committee On Large Dams (IRCOLD)

Advisor of M.Sc. students’ thesis in Iran

 

Key qualifications

 

Since 2010, Business Development Director.

Advisor of M.Sc. students’ thesis in Iran from 2001 to 2012.

A broad range of skills and experience throughout the applying hydro informatics models. Conducting many training courses on DHI software in Iran.

Project manager and modelling expert covering hydrodynamics, waves, and sediment transport and water quality.

Involving to numerous technical challenging in water sector studies such as water resources management, flood plain modelling, cooling water recirculation, hydro informatics models training, and capacity building.

DHI technical support and marketing manager for almost one decade in Iran.

 

 

Contact detail

 

 

Email: این آدرس ایمیل توسط spambots حفاظت می شود. برای دیدن شما نیاز به جاوا اسکریپت دارید

Mobile : +98 (912) 377 85 44

Tel/Fax : +98 (21) 8874 3465

 

 

 

Employment Record

Year

Firm

Position and Responsibilities

2010 – Date

 

YEKOM Consulting Engineers

Business Development Director

 

2013 -2014

Toseh Sanati Pendar

Chief Engineer in Coastal & Ports Projects (External project)

2013 -2014

Pouyandegaan Mohit Zist

Chief Engineer in Coastal & Ports Projects (External projects)

2010 - 2014

Asarab Consulting Engineers Company

Chief Engineer in Coastal & Ports Projects (External projects)

2005 - 2010

PTS Water & Environment Company

Managing Director

2001 - 2003

Tarh Andishan Consulting Engineers Co. (TACE)

Chief Engineer, Advisor of Managing Director in Coastal Projects (External projects)

2001 -2001

Sazeh Pardazi Iran Consulting Engineers Co. (SPI)

Senior Engineer, Sea Water Intake and Water Recirculation Modelling by MIKE 21 (External project)

2000 - 2000

Sahel Consulting Engineers Co. (SCE)

Senior Engineer, Hydrodynamic Modelling by MIKE 11 (External project)

2005 - 2006

Negareh Co.

Advisor of Negareh Managing Director on DHI Technical Support & Marketing Plans (Part time)

1998 - 2005

Negareh Co.

DHI Technical Support & Marketing Manager (Full time)

1996 - 1998

Negareh Co.

DHI Technical Support (Part time)

1997 - 1998

Soil Conservation Water and Watershed Management Research Center (SCWMRC)

Researcher, Working on M.Sc. thesis with titled “ Assessment of Sequence Storm on the Stability of Reshaping breakwaters”

1995 - 1996

Mahab e Ghodss Consulting Engineers Co. (MG)

Junior Engineer in Pasha kola EIA Study, Application Programmer in Hydro informatics Department

 

Experience record

Year

Project

Position and activities

2010 - Date

 

Business Development in CIS, African and Middle East countries

 

Dealing with clients and investors, providing EOI for World Bank and International funds. Meeting with clients, authorities and attending on exhibitions, conferences, seminars.

 

- Preparation of Expression of Interests (EOI); technical & financial proposals to WB, ISDB, EIB and IDA.

- Investigations on target markets.

- Preparing the contract documents for local and international clients.

- Monitoring and screening tender notices from different sources.

- Attending on the exhibitions and side conference exhibitions.

- Planning and providing marketing materials such as brochures and exhibition stands.

- Supervising the company’s website update.

- Collection of the CVs in WB, IDA and ISDB format.

- Preparing project data sheet in WB format (B Form)

- Preparing different MOU and JV agreements with local partners, consulting engineers and contractor companies at destination target markets.

 

- Preparing and providing more than 100 EOI and RFP on local and international projects with World Bank, Islamic Development Bank, International Development Association financing which some of them are mentioned as below:

 

  • “Detailed Engineering Design, Preparation of Tender Documents and Construction Supervision of Sewerage System Works in Singida Municipality and Water Supply Works“. Financier: World Bank (WB), September 2012.
  • Consultancy Services for Rural Areas Wastewater Project in North-east, Central and South-west Regions. National Water and Wastewater Engineering Company. Financer: IDB. July 2012.
  • “Consultancy Services for Detailed Environmental & Social Impact Assessment For Rehabilitation Of Same - Himo - Marangu Road (99.73 Km); Mombo - Lushoto Road (32 Km); Lusahunga - Rusumo Road (92 Km); and Nyakasanza - Kobero Road”. Financer: World Bank (WB), Transport Sector Support Project (TSSP). June 2012.
  • Comprehensive Agriculture and Rural Development Facility (CARD-F) Economic Development Package (EDP) for Behsud District, Nangarhar Province. Ministry of Rural Rehabilitation Development (MRRD). Afghanistan. May 2011.
  • On-Farm Water Management Project. Ministry of Agriculture, Irrigation & Livestock. Afghanistan. July 2011.
  • “Detailed Design and Construction Supervision For The Raw Water Conveyance System For Lilongwe Water Board”, Republic of Malawi. National Water Development Programme (NWDP). July 2012.
  • Technical Supervision of the Civil Works for Improvement of the Water Supply and Wastewater Removal Systems of Hrazdan Town. Armenia Water and Sewerage CJSC. November 2010.
  • Qom Sewerage Project in Iran. Qom Water and Wastewater Company. Financer: IDB. April 2010.
  • Construction Supervision of Wasit water treatment plant and water distribution network in Wasit Governorate. Ministry of Municipalities and Public Works. Republic of Iraq. May 2010.
  • Kashan Sewerage Project in Iran. Kashan Water and Wastewater Company. Financer: IDB. April 2010.
  • Feasibility Study for Proposed Bukhara and Samarkand Sewerage Project. International Bank for Reconstruction and Development (IBRD), World Bank (WB). April 2009.

 

- Preparing MOU with following companies:

  • Regierungsbaumeister Schlegel GmbH & Co. KG1
  • Hydroenergetica from Armenia
  • FBNE Ltd. from Tanzania
  • Omran holding group and Green-Tech from Afghanistan
  • Multiplex Professional Consulting Services Ltd from Nairobi, Kenya
  • Cardno Emerging Markets (East Africa) Ltd from Nairobi, Kenya
  • Shamal Design & Consulting Bureau Consultant Engineer from

Kurdistan Governorate – Iraq

  • Bangladesh Engineering and Technological Services Ltd.(BETS)
  • TEMPO Engineers & Consultants Inc from Ankara, Turkey

 

2013 -2014

Sea Water Intake and Water Recirculation Modelling for Mokran Petrochemical Mix Plant

 

Modelling of Sea Water Intake and Water Recirculation for Mokran Petrochemical Mix Plant by using MIKE 3 FM in Chahbahar Coast (Mokran) – Iran.

Mokran Petrochemical Mix Plant is under study and design on south east of Iran at vicinity of Oman Sea and Indian ocean. Due to vicinity of this area to Indian ocean, is the best place for exporting petrochemical products to the world. For processing of the utilities is essential to use sea water for the cooling system and water desalination. The purpose of this study is determining the Chabahar Bay capacity for maximum water intake and finding the optimum place for the inlet & outlet.

 

2013 - 2014

Study and simulation of Gorganroud River quality from Voshemgir Dam to the downstream (at junction of Caspian Sea and Gorganroud River)

 

Gorganroud river is located at Gorgan province in the north of Iran.

Gorganroud is limited to mountain area at upstream and reaches Caspian Sea at downstream. So many dams are constructed on upstream of Gorganroud river and also some other dams are under studies and constructions too. Construction these dams and increasing water needs at the region, releasing agriculture return water into the river, arriving other saline tributaries to the river and releasing wastewater of downstream cities to the river caused increasing salinity and deficits of water at downstream. The downstream remaining 12 km will be dried before arriving to the sea during end of June, July, August and early September. Golestan Water Authority (client) decided to study of Gorganroud river quality and quantity monitoring.

Gorganroud river quality and quantity modelling carried out along the monitoring. MIKE 11 applied for this modelling for determining of how much water with specified quality released from Voshmgir Dam and other tributaries to get obtain required quality and quantity at the downstream with considering minimum environmental requirements.

 

2013 - 2014

Assessment of sediment dispersion due to Hormuz port dredging

Hormuz island is located on Persian Gulf at the north east of Qeshm Island and the south east of Bandar Abbass. This island is in vicinity of Hormuz strait. Hormuz port is located on north west of the island. The island’s local people connection to other islands and Bandar Abbass port is just through Hormuz port. Then, periodically dredging of the port is necessary. Iranian Port and Maritime Organization decided to start dredging for getting suitable depth for ships manoeuvring at Hormuz port and the access channel on 2013.

As sediment dredging will have effect on environment of the island area and maritime life, and then Iranian MPO decided to study sediment dispersion due to the dredging and consequently identification effective zones of the island.

MIKE 21 model applied for the modelling of hydrodynamics, sediment dispersion due to dredging of the port and access channel.

Different scenarios determined for sediment spills during dredging execution and identified the zones affected by dispersion of sediment.

 

 

2013 - 2014

Assessment of Anzali port development effect on Anzali wetland

 

Due to turbulence of Anzali port during the storms and also increasing the port operation capacity, the client constructed new breakwater with a higher extension.

Anzali port constructed at the mouth of Anzali wetland. Then, it is essential to study effect of extension and rehabilitation the port.

on hydraulic condition, sediment transport and salt intrusion from the port to the wetland.

MIKE 21 FM as a comprehensive model applied for the modelling of hydrodynamics, sedimentation and salt intrusion at the port and mouth of wetland.

 

2012 - 2012

 

Hydrodynamics, sedimentation and water quality study of Gomishan shrimp farms complex

 

Gomishan shrimp farms complex constructed on 2003 that a water intake canal transfers water from Gomishan pond to the farms.

The pond is connected to Caspian Sea via some opening on the rock fill mound. Now, it is difficult to draw water from the pond due to falling down the sea water level. Also, the water quality of the pond gets less and less due to falling down the WL and increasing the released farms pollution to the pond.

It has been decided to study different scenarios for access to high quality water along safe water intake in case of decreasing the sea WL again

Hydrodynamics, sedimentation and water quality study has been carried out in this project and also different scenarios have been modelled.

MIKE 21 as a comprehensive model applied for the modelling of hydrodynamics, sedimentation and water quality.

 

 

2011 – 2011

 

Study of contaminants dispersion in reservoirs due to fortuitous event pollution risk with using MIKE 3 software (Case of study, Mamloo Reservoir) – Tehran Water Authority

 

Study of contaminant dispersion in reservoirs due to fortuitous event pollution risk is